Hall Construction Photos - Page 2
9/1/2010 - Rebar is also unloaded -- totaling over
22,000 pounds of steel to reinforce the concrete foundation.
9/2/2010
- At dawn, the first two trucks of steel beams for the main building
structure arrive.
9/1/2010
- Steel mesh for the concrete slab is delivered and offloaded.
9/2/2010 - A total
of four truckloads of steel arrive throughout the morning.
9/2/2010 - The final truck carries steel roofing
panels over 50 feet long to create a seamless roof.
9/3/2010 - Trucks deliver
gravel all morning for the base underneath the main floor area of
the two dining halls
9/3/2010 - A grader levels out the gravel to the proper grade so construction
of the footings can begin after Labor Day.